Bypassing the Supply Channel of a WWTP
Installation of a provisional pumping station to by-pass a supply channel of a Wastewater Treatment Plant
Context
Project Type :
Pumping Solutions
Location :
Aiguerelles stormwater tank - Montpellier (34)
Problem
- In the context of the modernisation project of the MAERA wastewater treatment plant, the client needed a provisional pumping station to bypass the main supply channel of the WWTP
Solution
- Bypass of 1440 to 3600 m³/h managed automatically by piezometric sensors
- Design, scaling, preparation, transport, handling, installation in urban environment, commissioning, tests, customer assistance, periodical inspections and removal of equipment.
- Bespoke container with 3 speed regulator cabinets 110-160 kW, 1 speed regulator cabinet 20-55 kW, 2 redundant level cabinets, 1 distribution cabinet, remote monitoring cabinets
- 1 submersible sewage pump of 45 kW and 3 pumps of 110 kW
- 4×50 m of pipes Ø 250 installed in confined environment by a diving company
- HDPE collector Ø 800 over 240 m
- Creation of a bespoke feeder Ø 800
- Pumping monitoring by NETBITER
- Duration: 3 months