By-pass d'une vis de relevage

Bypassing a Raising Screw

Ensuring treatment flow of wastewater of a wastewater treatment plant while reconditioning

Context

Project Type :

Pumping Solutions

Crisis management

Location :

Toulouse (31)

Problem

  • Following damage to a raising screw, ensuring the treatment flow of wastewater of a wastewater treatment plant while reconditioning

Solution

  • Emergency commissioning of 2 surface pumps with a flow of 1360 m3/h
  • Raising height: 3.50 m
  • Resumption of operation 4h after call
  • Duration: 15 days