Centrale d'énergie temporaire de 8 MVA

Electrical Power Supply of a Glassworks

Electrical power supply by load takeover connection to the mains of an energy plant HVA of 8 MVA

Context

Project Type :

Temporary Energy

Location :

Gironcourt sur Vraine (88)
Logo entreprise Owens-Illinois

Problem

  • The high voltage (HVB) line that supplies a glassworks had to be disconnected for scheduled works by the electricity transmission network
  • The customer had to supply the site without loss of power to maintain production during the stoppage of the source 63 kV substation

Solution

  • Installation of an energy plant of 8 MVA at 20 000 V
    • 4 generators of 2 000 kVA (production)
    • 4 transformers of 3 150 kVA (400 V / 20 000 V)
    • 2 generators of 60 kVA (auxiliary)
    • 1 container C13-200 (HVA distribution)
  • Electrical power supply byload takeover connection to the mains
  • Management of fuel supplies
  • 24h a day operation
  • Remote monitoring
  • Duration of production: 83 hours