
Case Studies

06/08/2020
Driving Channelling
Lowering the water table by wellpoints for driving channelling

06/08/2020
Emptying Form 8 of the Autonomous Port
Urgent emptying of 320 000 m³ of seawater for the naval site of Marseille

06/08/2020
Thermal Regulation in a Warehouse for Chocolates
Thermal regulation in a storage warehouse for chocolates and electrical power supply by generators

06/08/2020
Bypassing a Watercourse
Bypassing a watercourse and drying the site to install channelling

06/08/2020
Micro Plant 20 KV
Power supply to the HVA electrical mains with a 20 kV micro plant