Case Studies
06/09/2021
Emergency installation of a energy plant
Installation of a 12 MVA high voltage energy plant to substitute the turbo-alternator of a factory
06/08/2020
Emergency Power Supply to a Hypermarket
Emergency power supply to a hypermarket with 7 generators, following a fire to the LVDB.
06/08/2020
Emptying Form 8 of the Autonomous Port
Urgent emptying of 320 000 m³ of seawater for the naval site of Marseille
12/06/2020
Emergency Power Supply of a Wastewater Treatment Plant
Emergency electrical power supply for a wastewater treatment plant following a disaster with the substation and fire of the LVDB
11/06/2020
Electrical Power Supply for an Industrial Site
Emergency power supply to a production site with an HVA power plant of 5 MW following a turbo-alternator breakdown