
Case Studies

16/11/2020
Construction of an Office Block
Lowering the water table by bleeder wells during construction of an office building with 2 basement levels

06/08/2020
Lowering the Water Table in Sandy Ground
Lowering the water table in sandy ground to build a wastewater treatment plant, the wellpoint technique was used

06/08/2020
Wellpoints for Holding Tank
Dewatering by wellpoints for the construction of a rainwater holding tank

06/08/2020
Lowering the Water Table in an Urban Area
Lowering the water table in an urban area, with disposal in the Saône through a dewatering network of 2×400 m

06/08/2020
Lowering the Water Table by Needle-Type Filters
Lowering the water table by needle-type filters to install gas channelling under a roundabout