
Electrical Power Supply of a Glassworks
Electrical power supply by load takeover connection to the mains of an energy plant HVA of 8 MVA
Context
Project Type :
Temporary Energy
Location :
Gironcourt sur Vraine (88)

Problem
- The high voltage (HVB) line that supplies a glassworks had to be disconnected for scheduled works by the electricity transmission network
- The customer had to supply the site without loss of power to maintain production during the stoppage of the source 63 kV substation
Solution
- Installation of an energy plant of 8 MVA at 20 000 V
- 4 generators of 2 000 kVA (production)
- 4 transformers of 3 150 kVA (400 V / 20 000 V)
- 2 generators of 60 kVA (auxiliary)
- 1 container C13-200 (HVA distribution)
- Electrical power supply byload takeover connection to the mains
- Management of fuel supplies
- 24h a day operation
- Remote monitoring
- Duration of production: 83 hours


