Electrical Security of a Hospital Centre
Electrical security of a hospital centre when reconditioning its back-up power plant
Context
Project Type :
Temporary Energy
Location :
Romans (26)
Problem
- Ensuring the electrical security of a hospital centre when reconditioning its back-up power plant
- The installation must be capable of securing supply to the entire hospital
- Ensure minimum autonomy of 48 hours
Solution
- Commissioning a back-up generator of 2200 kVA
- Installation of an 20 000 liters additional fuel tank with insulation and tracing of fuel supply pipework
- Technical assistance during monthly load testing
- Management of cleaning, degassing and waste treatment in accordance with the regulation on transport of hazardous materials
- Duration: 18 months