Complete electrical power supply of the Musilac festival for 7 yearss

Context

Project Type :

Temporary Energy

Location :

Aix-Les-Bains (73)
Logo festival Musilac

Problem

  • Ensuring the complete power supply for the festival: lighting, sound, dressing rooms, restaurants, stands, camp sites

Solution

  • Twin packs: generators connected in “zero breakage” (redundant secured supply)
  • 18 generators of 40 kVA to 500 kVA
  • Special event-based distribution cabinets equipped with Powerlock connections
  • Commissioning of additional tanks to increase the autonomy of the generators
  • Provision of a generator operator throughout the duration of the festival
  • Refreshment of the catering:
    • Iced water unit: 100 kW
    • Air processing plant: 10,000 m³/h
  • Duration: 12 days