Musilac Festival
Complete electrical power supply of the Musilac festival for 7 yearss
Context
Project Type :
Temporary Energy
Location :
Aix-Les-Bains (73)

Problem
- Ensuring the complete power supply for the festival: lighting, sound, dressing rooms, restaurants, stands, camp sites
Solution
- Twin packs: generators connected in “zero breakage” (redundant secured supply)
- 18 generators of 40 kVA to 500 kVA
- Special event-based distribution cabinets equipped with Powerlock connections
- Commissioning of additional tanks to increase the autonomy of the generators
- Provision of a generator operator throughout the duration of the festival
- Refreshment of the catering:
- Iced water unit: 100 kW
- Air processing plant: 10,000 m³/h
- Duration: 12 days